Skip to main content
Drone aerial of a finished detached backyard ADU with shingle roof beside the main Roseville home and patio

Sacramento's Trusted ADU Contractor

Add living space, rental income, or multigenerational housing to your property. Garage conversions, detached units, and full permit guidance.

Call (916) 677-9774
  • Garage conversions & detached units
  • Permits handled across 3 counties
  • Fixed-price quotes — no surprises
Cost Calculator

Estimate Your ADU Cost in Minutes

No guesswork. Just a quick, clear estimate tailored to your project.

$280 / sq ft

700 sq ft

Monthly

$1,304

Total

$196,000

  • Licensed & Insured

    CA #1119373

  • 5.0 / 5 stars

    120 reviews

  • 15+ Years

    Family-owned

  • Local Sacramento

    14 service areas

  • Free Consultation

    No obligation

Free ADU Quote

Request Your Free ADU Quote

Fill out the form below and we'll call or text you within hours.

What kind of ADU are you considering?

Pick the option closest to your project. Not sure? That's okay — we'll help you decide.

ADU Construction in the Sacramento Area

Accessory Dwelling Units (ADUs) are one of the best investments a Sacramento homeowner can make. Whether you want to generate rental income, provide housing for aging parents, or create a home office, an ADU adds value and versatility to your property.

California has made ADU construction easier than ever with recent legislation including AB 976 and SB 543. Future Generation Construction is experienced with Sacramento County, Placer County, and El Dorado County permitting processes.

We specialize in garage conversions — the most cost-effective ADU option — as well as ground-up detached units up to 1,200 square feet. Our team handles design, permits, construction, and final inspection.

Two-story detached Roseville ADU with cream lap siding, gabled roof and address 218A above the front door

Our Process

How Your ADU Project Works

Four clear stages from the first lot walk to the day you hand over the keys — permits, framing, and finishes all handled by one in-house Future Generation Construction team.

Future Generation Construction ADU site visit and lot assessment in Sacramento area
01

Free Site Visit

We walk your lot, check setbacks and utilities, and talk through your goals — rental income, in-law unit, or home office.

Sacramento ADU interior design — open-concept kitchen and living area
02

Permits & Design

We handle the entire permit process — site plans, Title 24, structural calcs, plan-check response — across Sacramento, Placer and El Dorado counties.

Sacramento ADU construction in progress — roof framing by Future Generation Construction
03

Construction

Foundation, framing, plumbing, electrical, drywall and finishes — all handled by our in-house crew. One number to call, one team accountable.

Completed Sacramento detached ADU — final inspection and walkthrough
04

Final Inspection & Keys

We coordinate every county inspection through final sign-off, then walk every outlet, fixture and finish with you before you take the keys.

Our Work

ADUs We've Built Across Greater Sacramento

Garage conversions, attached additions, detached units — each project handled end-to-end by Future Generation Construction, from permit to final walk-through.

Featured Project

Roseville Detached ADU

This 550-square-foot detached ADU in Roseville stands as a premier example of how thoughtful design and expert execution can transform a backyard into a sophisticated, fully independent residence. Designed to offer a perfect balance of privacy and modern luxury, this one-bedroom, one-bathroom home provides an expansive feel that belies its efficient footprint.

  • Detached 1 Bed / 1 Bath
  • 750 sq ft Footprint
  • Full Permit Handling
  • Completed in 5 Months
View Project Details

From permits and design to plumbing, framing, and finish work, Future Generation Construction handled everything. Our detached ADU brings in rental income every month and was completed right on schedule.

Verified Homeowner, Roseville5.0
Roseville Detached ADU — featured Future Generation Construction project in Roseville, CARoseville, CA

100+

Projects Completed

5.0★

120 Verified Reviews

30+

Years Combined Experience

#1119373

Licensed & Insured

Behind the Build

ADU Photo Gallery

Finished ADU projects across Greater Sacramento, plus a few behind-the-scenes shots so you can see the build process.

Roseville detached ADU — drone aerial view of finished build
1 / 17

Video Testimonials

What Our Clients Had to Say About Us

Watch real clients share their experiences working with our team.

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Granite Bay clients feedback on working with Future Generation Construction

Feedback from Debra Alqiza on working with Future Generation Construction

Kitchen remodeling by Future Generation Construction

Feedback from Genevieve’s family on working with Future Generation Construction

Feedback on working with Future Generation Construction

Kitchen Remodel in El Dorado Hills

Building an ADU with Future Generation Construction

Client testimonial working with Future Generation Construction

Client Testimonials

What Our Clients Say

Real stories from real homeowners across the Sacramento area.

California ADU Laws

2025-2026 ADU Regulations Update

  • Detached ADU max

    1,200 sq ft · 16-18 ft height

  • Impact fees waived

    For units ≤ 750 sq ft

  • 4 ft setbacks

    Rear and side property lines

Sacramento garage-conversion ADU — open-plan living with full kitchen, sliding barn door and LVP flooring
We handle your ADU build like it's our own — from permits to final inspection.

FAQ

ADU Construction FAQ

An ADU (Accessory Dwelling Unit) is a fully self-contained second living space on the same lot as your primary residence. By definition it has its own entrance, kitchen (or kitchenette), bathroom, and sleeping area. ADUs come in three flavors: detached (a standalone backyard cottage), attached (an addition that shares a wall with the main house), and conversion (a garage, basement, or interior space converted into a separate dwelling).

Unlike a standard addition, an ADU is treated by California law and most lenders as an independent dwelling — which is what unlocks the rental income and resale-value benefits. A bedroom addition expands your house; an ADU creates a second housing unit on the same property.

Real Sacramento-area numbers from our recent projects:

  • Garage conversion (400–500 sq ft studio): $100,000 – $145,000
  • Garage conversion (one-bed, 450–500 sq ft): $130,000 – $175,000
  • Detached studio (500–600 sq ft): $200,000 – $260,000
  • Detached one-bed (700–800 sq ft): $240,000 – $320,000
  • Detached two-bed (1,000–1,200 sq ft): $320,000 – $450,000+

Our quotes are line-item itemized and include design, permits, materials, labor, and utility connections to a Certificate of Occupancy. See our ADU Cost Guide for a deeper breakdown.

A typical detached ADU runs 9–14 months from contract to renter move-in. The breakdown:

  • Initial design and feasibility — 3–4 weeks
  • Construction documents — 4–6 weeks
  • Permit and plan check — 6–10 weeks (county-dependent)
  • Construction — 16–22 weeks
  • Final inspection and CO — 1–2 weeks

Garage conversions are faster: typically 4–6 months total because you skip the foundation, framing, and roofing stages — the existing structure is already there. Weather, lender funding speed, and homeowner decision-making all influence the timeline.

Garage conversions are the most cost-effective option — you save 30–50% versus building from the ground up because the foundation, framing, and roof already exist. They're ideal if your existing garage has good bones and you don't need more parking. Most are 400–500 sq ft and rent for $1,500–$2,200/month.

Detached ADUs cost more upfront but generate higher rental income ($2,000–$3,000/month for 700–1,000 sq ft units) and add a discrete appraisable asset to your property. They're the right call when you want a true one or two-bedroom unit, when your garage is too small or in poor condition, or when you need to keep parking available. Read more on our Garage Conversion and Detached ADU pages.

Long-term rentals are allowed everywherewe serve under California state law. Under AB 976, you don't even need to live on the property anymore — your ADU can be a pure rental investment.

Short-term rentals (Airbnb, VRBO)depend on local rules and vary city by city. The City of Sacramento allows short-term rentals with a Short-Term Vacation Rental permit. Some surrounding cities require minimum 30-day stays. Some HOAs add their own restrictions. We'll review your specific jurisdiction during the planning meeting so you know exactly what's allowed before you commit to the build.

Yes, every ADU requires permits — whether new construction, garage conversion, or interior conversion. Skipping permits leads to problems at resale time, voids most insurance policies, and creates liability for unpermitted construction.

We handle the entire permit process for you.Site plans, floor plans, structural calcs, Title 24 energy compliance, submission to Sacramento, Placer, or El Dorado County, plan-check response, building permit pickup, and coordination of every inspection during construction. You don't fill out a single form. See our ADU Permits page for the county-specific details.

California law caps detached ADUs at 1,200 square feet statewide; most cities also adopt this maximum. Attached ADUs are typically capped at 50% of the primary house size, with a 1,200 sq ft ceiling. JADUs (Junior ADUs, inside the existing home) max out at 500 sq ft.

Heights are capped at 16 feet for one-story ADUs in most jurisdictions (some allow up to 18 feet). Two-story ADUs are permitted up to 25 feet under SB 477 conditions. Setback requirements (4 feet from side and rear property lines) cannot be increased by local jurisdictions — that's state-mandated.

Yes — but only on the value of the addition itself, not your entire property. California's Proposition 13 protects the existing assessed value; the ADU is added to your assessment at construction cost. Plan on roughly 1.1–1.25% of construction cost in additional annual property tax.

For example, a $250,000 detached ADU adds approximately $2,750–$3,125 per year in property tax. Compared to typical Sacramento ADU rental rates of $24,000–$36,000/year, the ADU is still strongly cash-flow positive. Always confirm specifics with your tax advisor and the county assessor — there are some narrow exemptions for ADUs used by family members.

The most common ADU financing paths in 2025–2026:

  • Cash-out refinance on the primary residence — the new ADU value is captured in the appraisal, often allowing a refi at a similar LTV. The most common path for clients with equity.
  • HELOC (Home Equity Line of Credit) — flexible draw, interest-only payments during construction, ideal for homeowners who want to phase costs.
  • CalHFA ADU Grant — up to $40,000 from the State of California for income-qualified homeowners. Funding cycles are competitive — apply early.
  • Construction-to-permanent loan — a single loan that converts to a mortgage at completion. Best for clients without sufficient existing equity.

See our Financing page for more options. We can connect you with lenders who specialize in ADU loans if helpful.

No — not anymore. California AB 976 (effective 2025) eliminated the owner-occupancy requirement for ADUs. You can build an ADU as a pure rental investment, rent both the main house and the ADU separately, or live in the ADU and rent out the main house.

The one related rule still in effect: under AB 1154 (effective 2026), Junior ADUs (inside the existing home) require owner-occupancy unless the JADU has its own separate bathroom. Detached and attached ADUs have no owner-occupancy requirement at all.

For most Sacramento-area ADUs, the most cost-effective approach is sub-metering off the existing main service. The ADU runs on its own dedicated circuits but bills consolidate with the primary house. We provision a separate sub-panel sized to the unit's calculated load.

If you want fully separate billing, dedicated meters cost an additional $3,000–$8,000 per utility. Some jurisdictions or HOAs require it. For sewer, we tap into the existing main line. For gas, many of our recent ADUs are all-electric(heat-pump HVAC, induction range, electric water heater) — simpler and avoids gas-line trenching costs entirely. We'll review your property during the consultation and recommend the most efficient setup.

California state law mandates 4-foot side and rear setbacks from property lines for ADUs — local jurisdictions cannot increase this. Front setbacks match the underlying zoning of the primary residence (typically 15–25 feet depending on the zone).

There is no minimum lot sizefor an ADU under state law. As long as the ADU fits within the setbacks and meets height limits, your lot qualifies. The smallest detached ADU we've built sat on a 5,000 sq ft urban lot. Coverage limits (the percentage of your lot that can be built upon) generally apply, but state law allows ADUs up to 800 sq ft regardless of coverage limits. We'll survey your specific lot during the feasibility consultation to confirm a comfortable footprint.

  • Licensed & Insured

    CA License #1119373

  • Combined Experience

    30 years

  • Family Owned

    Local & Trusted

  • 120 Reviews

    5-star rated

Special Offer

Get Up To

$5,000 OFF

Your ADU Project!

Ready to Build Your ADU?

From permits to final inspection — we handle it all. Start with a free consultation.

(916) 677-9774
  • Licensed & Insured
  • 5-Star Rated
  • Local Sacramento Team
Paul, owner of Future Generation Construction

Start Your ADU Project

Add a New Income
Stream to Your Lot

Free consultation across Sacramento, Placer & El Dorado counties. From permits to final inspection, we handle every step of your ADU build.

Free In-Home Estimate

We visit your home and provide a detailed quote.

Licensed & Insured

CA License #1119373. Bonded & fully insured.

Local & Family-Owned

Proudly serving Greater Sacramento for 30+ years.

5-Star Rated

120 reviews across Google, Yelp & Angi.

Tim, Future Generation Construction

We treat every home like it's our own. Our goal is simple — quality work, clear communication, and happy homeowners.

Tim

Future Generation Construction

Schedule Your Free Consultation

It only takes 1 minute. We'll handle the rest.

1

Your Information

Step 1 of 2

2

Project Details

Step 2 of 2

  • No Obligation

    Free consultation

  • Fast Response

    Within 24 hours

  • Your Privacy Matters

    We never share your info

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Google reviews

5/5

29 Reviews

Yelp reviews

5/5

4 Reviews

Angi reviews

5/5

24 Reviews

We respect your privacy and never share your information.

@futgenconstruction

Follow our latest projects

Follow on Instagram

Why Sacramento Homeowners Choose Future Generation Construction for ADUs

An accessory dwelling unit is one of the most consequential building decisions a Sacramento homeowner can make. The wrong contractor turns it into the most expensive mistake on your property; the right one turns it into a 5–10 year payback investment that adds long-term cash flow and resale value. Future Generation Construction has built every kind of ADU across the Greater Sacramento Area: garage conversions in Citrus Heights ranches, modern detached units in Granite Bay, two-bedroom backyard cottages in El Dorado Hills, and JADUs inside aging Carmichael homes.

What sets us apart is a single project manager from contract through Certificate of Occupancy, in-house tradespeople (no subcontractor scheduling gaps), line-item itemized fixed-price contracts, and direct experience with the permit processes in Sacramento County, Placer County, and El Dorado County. We are fully licensed (CA #1119373), bonded, and insured; both certificates land in your project folder before any saw runs.

What you should expect from any ADU contractor

  • A written, fixed-price quote with line items for design, permits, materials, labor, and contingencies. "Time and materials" pricing on an ADU is a red flag — the scope is too well-defined to need it.
  • Proof of license, bond, and insurance before the contract is signed. The CSLB license number is verifiable on cslb.ca.gov in 30 seconds.
  • A single point of contact who knows your project file. Hand-offs between sales, design, and construction departments cause 80% of mid-project communication failures.
  • Daily progress updates during construction. We send photos and a status note from the project manager every working day.
  • A realistic timeline presented before signing. Anyone promising a 3-month detached ADU is either skipping permits or hasn't read the latest building code.

Understanding ADUs — Four Types, Different Tradeoffs

California groups ADUs into four configurations. Picking the right type for your property is the single most important early-stage decision; it determines budget, timeline, rental income potential, and resale value.

Detached ADU

A standalone structure on your property — fully independent home with its own entrance, kitchen, bathroom, and utility connections. State law allows up to 1,200 sq ft. Detached ADUs cost the most upfront ($200,000 – $450,000+) but generate the highest rental income ($2,000 – $3,000/month) and add a discrete appraisable asset to your property. Read more on our dedicated Detached ADU page.

Attached ADU

An addition that shares a wall with the main house but has a separate entrance, kitchen, and bathroom. Attached ADUs are capped at 50% of the primary house size with a 1,200 sq ft ceiling. They're less expensive than detached because of shared structural elements, and they integrate visually with the main house. Best when your lot has limited backyard space.

Garage Conversion

Convert your existing garage into a fully-permitted dwelling. The most cost-effective ADU option ($100,000 – $175,000) because the foundation, framing, and roof already exist. Most Sacramento garages are 400–500 sq ft, perfect for a studio or compact one-bedroom unit. Read our complete guide on Garage Conversion ADUs.

Junior ADU (JADU)

A unit up to 500 sq ft created inside the existing footprint of the primary residence — typically by partitioning off a portion of the home with a separate entrance and kitchenette. JADUs may share a bathroom with the main house. The most affordable path to ADU rental income, but with the smallest footprint.

California ADU Laws — A 2025–2026 Quick Reference

California has reshaped ADU regulation over the past five years, dramatically reducing the friction homeowners face. Here is what currently applies:

  • AB 976 (effective 2025+): Owner-occupancy requirement removed. You no longer have to live on the property where your ADU is located. Pure rental investments are now legal.
  • AB 1154 (effective 2026): JADU owner-occupancy requirement waived when the JADU has a separate bathroom.
  • SB 543 (effective 2026): Jurisdictions must determine application completeness within 15 days. Miss the deadline, and the application is automatically deemed complete.
  • SB 937 (effective 2026): Impact fees now collected at final inspection, not at building permit issuance — a major cash-flow improvement.
  • AB 2533 (effective 2026): Streamlined legalization path for previously unpermitted ADUs that meet current health and safety standards.
  • State setback rules: 4-foot side and rear setbacks; jurisdictions cannot increase. 16-foot height for one-story; 25-foot height for two-story under SB 477 conditions.
  • Impact fee exemption: ADUs ≤ 750 sq ft are exempt from impact fees. Larger ADUs are pro-rated.

For a complete walkthrough of the permit process by county, see our dedicated ADU Permits page.

ADU Cost Breakdown for Sacramento (2025–2026)

The honest answer to "how much does an ADU cost?" is "it depends on the type, size, and finish level." Here are real ranges from our recent local projects:

Garage Conversion ADUs

  • Studio + kitchenette + bath, 400–450 sq ft: $100,000 – $145,000 all-in.
  • One-bedroom + full kitchen + bath, 450–500 sq ft: $130,000 – $175,000 all-in.

Detached ADUs

  • Studio (500–600 sq ft): $200,000 – $260,000.
  • One-bedroom (700–800 sq ft): $240,000 – $320,000.
  • One-bed + den (900–1,000 sq ft): $280,000 – $375,000.
  • Two-bedroom (1,000–1,200 sq ft): $320,000 – $450,000+.

These figures include design, permits, materials, labor, and utility connections all the way to a Certificate of Occupancy. They are not "starting at" prices that balloon during construction. For a full breakdown by line item, see our ADU Cost Guide.

Soft costs to budget alongside construction

  • Permits and plan check fees: $4,000 – $12,000.
  • Impact fees (only for ADUs over 750 sq ft): $5,000 – $25,000.
  • School district fees: $1,500 – $6,000.
  • Sewer/water connection (if separate metering): $3,000 – $10,000.
  • HERS testing: $500 – $1,200.
  • Soils report (where required): $1,500 – $3,500.

Financing Your ADU Project

Most Sacramento homeowners finance their ADU through one of four paths:

  1. Cash-out refinance. The new ADU's value is reflected in the appraisal, often allowing a refi at a similar loan-to-value ratio. The most common path for clients with existing equity.
  2. Home Equity Line of Credit (HELOC). Flexible draw schedule, interest-only payments during construction. Rate-sensitive but lower closing costs than a refi.
  3. CalHFA ADU Grant. Up to $40,000 from the State of California for income-qualified homeowners. Funding cycles are competitive — apply early.
  4. Construction-to-permanent loan. A single closing that converts to a mortgage at completion. Best for homeowners without sufficient existing equity.

We can connect you with lenders who specialize in ADU financing if it's helpful. For a broader overview of payment options on any of our remodeling services, see our Financing page.

The ADU Construction Process — Step by Step

Every ADU we build follows the same project-management framework. The pieces vary by ADU type, but the rhythm is consistent.

  1. Initial consultation (free, 60–90 minutes). Project manager visits your property, walks the lot, photographs conditions, discusses goals and rough budget.
  2. Design and quote (3–7 business days after the visit). We deliver a written scope, conceptual layout, material recommendations, line-item budget, and timeline.
  3. Contract and design refinement. Selections finalized, contract signed.
  4. Construction documents (4–6 weeks). Full building plans, structural calcs, Title 24 energy compliance, ready for permit submission.
  5. Permit and plan check (6–10 weeks county-dependent). We submit, respond to plan-check comments, and pull the permit when it's issued.
  6. Site preparation and foundation (2 weeks for detached; skipped for conversions).
  7. Framing and dry-in (3–4 weeks for detached; 1 week for conversions).
  8. Mechanical, electrical, plumbing rough-in (2 weeks).
  9. Inspections, drywall, finishes (8–10 weeks).
  10. Final inspection and Certificate of Occupancy (1–2 weeks).
  11. Post-completion follow-up. 30-day check-in. 90-day in-home walk-through if requested. 1-year warranty.

Total elapsed time is typically 9–14 months for a detached ADU and 4–6 months for a garage conversion.

ADU Rental Income — What Can You Actually Earn?

Rental rates vary by ADU size, finish level, and submarket. Recent Sacramento-area numbers from rentals we have either built or visited:

  • Studio garage conversion: $1,500 – $1,900/month long-term; $2,500 – $3,500/month for short-term rental in permitted markets.
  • One-bed garage conversion: $1,800 – $2,200/month long-term.
  • 500–700 sq ft detached studio/one-bed: $2,000 – $2,600/month.
  • 900–1,200 sq ft detached one-bed/two-bed: $2,400 – $3,000/month.

Rates trend higher in Granite Bay, El Dorado Hills, Folsom, and Loomis. They trend lower in some inner-city Sacramento submarkets but are offset by faster lease-up times because of higher rental demand.

Payback math at $2,000/month rent

A $130,000 garage conversion generates roughly $24,000/year gross rent. After typical operating expenses (insurance, taxes, vacancy reserve, modest repairs), net cash flow lands around $18,000–$20,000/year — a 5.5–7 year payback on the original investment. After payback, the unit produces near-pure cash flow for the rest of its life and adds significant resale value to the property.

Common ADU Mistakes — and How We Avoid Them

  1. Hiring a general remodeler with no ADU-specific experience. ADUs have their own permitting nuances, energy compliance documentation, and inspection sequencing. Pick a contractor who has built at least 5 ADUs in the same county where you're building.
  2. Choosing the cheapest bid. The lowest bid almost always reflects either an underestimated scope (change orders coming) or a substandard finish package. Compare line-by-line, not just total.
  3. Skipping the permit process. Unpermitted ADUs surface during home sales and tank the deal. AB 2533 (2026) creates a legalization path, but the cost and friction far exceed pulling the permit on day one.
  4. Underestimating utility connections. Sub-meter vs. dedicated meter, gas line trenching, sewer ties, water-pressure adequacy — these have to be reviewed up front. We do that during the feasibility consultation, not after foundation pour.
  5. Building too small to maximize rental return. The cost difference between a 500 sq ft studio and a 700 sq ft one-bedroom is small (~$30,000), but the rental difference is $300–$500/month — a 1–2 year payback on the bigger unit alone.
  6. Ignoring the impact-fee threshold. ADUs ≤ 750 sq ft skip impact fees entirely. Building 760 sq ft instead of 750 sq ft can add $5,000–$25,000 in fees with zero rental income upside.
  7. Underestimating soft costs. Permits, school fees, soils reports, HERS testing — these add 5–10% to the construction-only number and surprise budget-margin homeowners.

Service Areas — ADU Construction Across the Greater Sacramento Region

We serve all 14 cities in our 30-mile service radius. Click any city below for response-time, recent local projects, and the specific permitting pathway:

Beyond the Basics — Additional ADU Knowledge

Can the ADU be sold separately from the main house?

Generally no. ADUs are accessory to the primary residence and cannot be sold independently on the same lot under current state law. There are emerging exceptions for ADUs in some condo-converted situations — consult your real-estate attorney if this is a goal.

Will the ADU affect my homeowner's insurance?

Yes, you should add the ADU to your homeowner's policy or carry a separate landlord policy on the unit. Premiums typically increase $300–$800/year depending on coverage limits. Notify your insurer before the unit is occupied.

What about HOAs?

California state law preempts most HOA restrictions on ADUs. HOAs cannot ban ADUs outright, though they retain some design-review authority on aesthetics. We pull your CC&Rs during planning and review any HOA restrictions before submitting permits.

Can I use a pre-approved plan to speed up permits?

Sacramento County offers a pre-approved plan program with shorter review times (often 2–4 weeks faster than custom review). We'll check whether one of the pre-approved plans fits your lot before recommending a custom design.

What happens if I want to add a second story to an existing ADU later?

Possible but expensive. Adding a second story to an existing single-story ADU requires structural reinforcement of the foundation, additional load calculations, and re-permitting. If you suspect future expansion, design the original ADU with a "stub-up" foundation rated for two stories — adds ~$8,000–$12,000 today, saves $40,000+ later.

Explore ADU Sub-Services in Depth

Each major ADU configuration has its own dedicated page with deep-dive content, project examples, and sub-service-specific cost ranges:

For complementary remodeling services on the primary residence, see our Kitchen Remodel and Bath Remodel service pages.

Recent ADU Projects in the Sacramento Area

Browse completed ADU work across our portfolio:

  • Roseville Detached ADU — 550 sq ft modern farmhouse one-bedroom with butcher block kitchen, designer tile bath, walk-in shower, and full independent utility connections.
  • Garage ADU Conversion in Sacramento — complete 500 sq ft studio with sage-green cabinets, white quartz, and modern walk-in shower with penny tile floors. Includes a video testimonial from the homeowner.
  • Fair Oaks Attached ADU — closely-related attached configuration on a Fair Oaks property.

The full portfolio filters by project type — select the ADU pill to see every ADU we have completed.

Ready to Start Your ADU Project?

Future Generation Construction is a fully licensed (CA #1119373), bonded, and insured contractor based in the Greater Sacramento Area. Every ADU project includes a free in-home consultation, a written fixed-price quote, a single project manager from start to Certificate of Occupancy, and a 1-year installation warranty. We've been featured in client video testimonials, earned 5.0★ across 120 reviews on Google, Yelp, Angi, HomeAdvisor & Thumbtack, and have completed projects across all 14 Sacramento-area cities we serve.

Schedule your free estimate or call (916) 677-9774 — most homeowners hear back from us within 24 hours, often the same business day. We'll walk your property, discuss design and budget options, and provide a written feasibility report within 5 business days. No pressure, no obligation, no hidden fees.

Let's Build Your Sacramento ADU

Free in-home consultation. Transparent fixed-price quote in 5 business days. No pressure, no obligation.

(916) 677-9774